Energy Optimized Factory 🇮🇹

An industrial asset optimization program based on digital energy service contracts and quick wins.

Are you ready to take on the challenge and bet on your energy savings?

The goal is to focus on the 4 main assets (chillers, compressors, CHP & steam) of the top 100 industrial sites in order to reduce energy consumption and CO2 emissions gaining new fine tunings optimizations through data driven models.

The twist? An innovative collaboration model. Industrials benefit from a shared collaboration model, where both METRON and participants bet on the result together. The first goal is to reach quick wins (ROI <1 year) and enable users to bring results and scale fast within the site and the corporate group.

DEADLINE FOR APPLICATIONS: 31ST MAY, 2025.

Key Information

Objectives

Energy optimization of 4 assets: chillers, compressors, CHP and steam plants.

Shared savings and ROI <1 year.

Quick wins to foster a digitalization culture and facilitate digital energy transformation.

How?

Easier access to the digital energy management and optimization platform (EMOS) for 36 months.

Use of machine learning algorithms to create baselines and optimization energy models.

Integration of data with energy and engineering digitalization expertise.

Continuous improvement and management of the optimum over time.

Dedicated support from experts working alongside you by combining technology and human expertise.

Access to a community to share best practices.

Application Criteria

Location

  • Site in Italy and presence of several sites in Europe
  • Countries: Austria, Belgium, Denmark, Finland, France, Germany, Ireland, Italy, Luxembourg, Norway, Netherlands, Poland, Portugal, Spain, Sweden, Switzerland, United Kingdom

Sector

  • All industries such as: Food & Beverage, Wood & Paper, Mining, Glass, Chemical & Pharmaceutical, Aeronautics, Automotive & Transportation, Metals, Plastics & Semiconductors, Minerals, Cement, Cosmetics, Iron & Steel...

Energy Dimension

  • Energy cost per site: 5mln€/year
  • On-site consumption (combined electricity & gas): 80 GWh/year

Number of Sites

  • Minimum 3

PRIORITIZE INTERVENTIONS WITH GREATEST IMPACT

MAXIMIZE INITIAL SAVINGS

ROI WITHIN THE FIRST YEAR

Apply to the Energy Optimization Factory Program